Description
Work carried out on the laser:
- 1: Complete cleaning and cooling unit.
- 2: Change linear guide of the Ram and the protection belows.
- 3: Change the Y axis pads as well as the screw bearings.
- 4: Change the X axis pads as well as the screw bearings.
- 5: Modification of the lubrication system.
- 6: Change the lubrication valve metrings.
- 7: New chiller pump.
- 8: Change spring stell protection (ball screw & X axes)
- 9: Turbine rebuilt.
- 10: Roller of the Y curtain redone.
- 11: New suction filters.
- 12: Axis drive complete check.












